Joutseno Gasifier Building

Toholampi CHP

200 m Tall Chimney for Eesti Energia

Description

AS Maru Metall signed a contract with Ferbeck Industrial Chimenys on the 17th of August in 2012 for manufacturing Eesti Energia the new 300MW power plant chimeny platforms. The contract includes the steel structure manufacturing and the scope of works are approximately 70 tons of steel structures including the ladders, handrails and gratings. The biggest challenge was the manufacturing of 1,7 meters welded beams.

LKAB WGC Plant

Description

Maru Metall signed an agreement with Outotec GmbH on January 2nd 2013 to design and produce steel frames for gas treatment plant built on LKAB territory. The contract covers the production of approximately 750 t of steel structures, in addition ladders, stainless steel handrails, grilles, steps, etc.

40 MW Pellet-fired Heating Plant in Turku, Finland

Description

In Spring 2015 Maru Metall AS signed a contract to produce steel frames for 40 MW Pellet-fired Heating Plant in Turku, Finland. The contract involves the production of about 155 tons of steel structures, in addition railings, gratings, steps, etc.

Roofs of the Grandstands at the Lilleküla Football Stadium

When constructing sports facilities, steel structures enable suitable solutions to be found under very different conditions. This is proven by the various cantilevered structures that were used for the roofs of the grandstands at the Lilleküla Football Stadium, which different from ordinary steel frames, and the two football arenas built in Iceland, with cladding and supporting structures that had to withstand greater than normal wind loads and the harsh Icelandic climate.