Costas Invest OÜ laohoone

AS Maru Metall tootmishoone laiendus

Mira lao- ja tootmishoone juurdeehitus

AS Technomar & Adrem tootmishoone laiendus

Kirjeldus

Projekteerimise ja ehituse peatöövõtt, Maru THM: karkassi paigaldus

Vundamendi kirjeldus: kannvundamendid
Karkassi kirjeldus: metallkonstruktsioon
Katusekandjate kirjeldus: profiilplekk 113 mm, kivivill + SBS kate
Seinakonstruktsioonide kirjeldus:125 mm kivivilla paneelid

Maru büroohoone

Description

The MARU office building has a unique location in Tallinn – on the border of Lake Ülemiste and the city center. Both, the city center and the Tallinn Airport are only a five-minute drive away. Although the building is located on one of the city’s important arteries, with its greenery and view of the Tallinn skyline, the building provides an attractive and calm working environment.

 

Bank of Estonia Gallery

Description

The Bank of Estonia Gallery is a spatial glass gallery in a steel structure, which is located in an enclosed interior courtyard and is a hidden architectural jewel. The spatial steel frame
was built in the factory, and thereafter, cut into sections for transporting purposes, delivered to the site and reassembled. This complicated assignment provided valuable experience.

Production Plant Extension for Maru Metall AS

Väo Combined Heat and Power Plant

Steel is suitable for the construction of industrial buildings because of its practicality and rapid construction. By building with steel, it is easy to take the needs of future production into account. When designing industrial buildings, it is very important to adapt the frame of the building to the client’s equipment. Since Maru Metall also provides designs for metal structures and the preparation of product drawings as a supplementary service, we can have no problem coping with complicated technological projects.

Description

The production of the steel structures for the Väo Combined Heat and Power Plant were complicated by the large volume and short completion deadline of the project. Installation was made more difficult by the necessity to install the framework one floor at time, simultaneously with the equipment for the power plant.

LKAB WGC Plant

Description

Maru Metall signed an agreement with Outotec GmbH on January 2nd 2013 to design and produce steel frames for gas treatment plant built on LKAB territory. The contract covers the production of approximately 750 t of steel structures, in addition ladders, stainless steel handrails, grilles, steps, etc.

Reactor Supports

Peurunka Icehall Steel Constructions

Gardemoen Conference Center