Baltic Works OÜ tootmishoone juurdeehitus

Pajarinki-Halli

AS Technomar & Adrem tootmishoone laiendus

Kirjeldus

Projekteerimise ja ehituse peatöövõtt, Maru THM: karkassi paigaldus

Vundamendi kirjeldus: kannvundamendid
Karkassi kirjeldus: metallkonstruktsioon
Katusekandjate kirjeldus: profiilplekk 113 mm, kivivill + SBS kate
Seinakonstruktsioonide kirjeldus:125 mm kivivilla paneelid

Floor Works for Famar-Desi Grupp Warehouse

Concrete Works of Refuse-Derived Fuel Plant for Ragn-Sells

Description

Ragn-Sells RDF Plant is unique in a way that it is capable of recycling 85% of handled waste. The technology of this refuse derived fuel plant sets all new standards in the entire Scandinavia. As a result, the high quality waste fuel supply could be used by different boiler plants in Estonia and abroad.

Design and construction of the Ragn-Sells refuse derived fuel plant was a complicated task that required the utmost reponsibility, effort and learning ability of the entire Maru team. Complex technology forced strict requirements to general construction and cooperation between different international parties. BIM modeling, that is still very uncommon in Estonia, was applied in design process. Construction procedure involved various lean construction techniques.

Sedimentary Basin for Compound Storage in EE Kaevandused Energy Complex

Concrete Works of Enefit-280 Fuel Handling System

Erection and Concrete Works for Oskarshamn CHP Plant

Foundations for Pajarinki Production Facility

Industrial Building for Waste Handling

Leppävirta Heating Plant

Turenki Heating Plant

Description

In the beginning of the year 2014 AS Maru Metall and Maru Rakennus OY signed a contract to produce steel structures for a heating plant. The contract includes the production of about 80 t of steel structures, including ladders, handrails, grilles, steps, etc..
The building will be finished in 2014.