Description
The project total capacity is about 650 tons of steel structures and additionally handrails, gratings etc. Karlstad CHP was completed in 2014.
The project total capacity is about 650 tons of steel structures and additionally handrails, gratings etc. Karlstad CHP was completed in 2014.
AS Maru Metall produced steel constructions for CHP in Oskarshamn, Sweden. Total 290 T of steel.
AS Maru Metallsigned a contract in the summer of 2015 to produce a steel frame for biomass fired steam boiler plant in Lahti.The contract witholds ca 180 tons of steel, in addition railings, gratings, steps, etc. The building is finished in 2015.
PVC hangar 54,3 x 72,3 x 5,5 m with a canopy and loading dock
Steel structures
Wall panels
SBS roofing
Maru Metall AS: production
Description of the frame: steel frame with two beams with a length of 16.5 m
Description of roofing materials: metal bearing sheet, office – wooden towel
Description of wall constructions: warehouse – light panel, office – three-layer r / b panels
Description
Lacquering plant and renovation of an old building
Frame Description: steel frame, reinforced concrete walls in the basement
Description of roofing materials: steel trusses
Description of wall constructions: sandwich panels, partially lightweight and Columbia stone walls