References
Erection of Steel Structures for Enefit280 Oil Plant
Customer: | Eesti Energia Tehnoloogiatööstus AS |
Location: | Ida-Virumaa |
Capacity: | 5000 t |
Description
Enefit-280 Oil Plant is by far the largest project in the history of Maru Ehitus due to the tonnage of its steel structures. It also serves as a perfect example to demonstrate the excellent teamwork skills of different subsidiaries within the Maru Group. Steel construction was produced by Maru Metall and designwork was done in cooperation with German engineering firm, general contractor Outotec GmbH, and the designers of Maru Ehitus and Maru Metall. Erection work was conducted by the subsidiary company of Maru Ehitus, Maru THM. Work that was completed within the estimated timeline showed the proficiency of excellent teamwork between the various facilities of the Maru Group and also provided a great experience to all.
Work is carried out by Maru THM OÜ
Maru THM OÜ
Järvevana tee 5,
10132 Tallinn, Estonia
Phone: +372 650 8840
Fax: +372 650 8849
E-mail: thm@marurakennus.fi